Kitchen refresh

Cabinets stay. New quartz, hardware, tile backsplash, and a painted ceiling. Time and materials with a weekly cap.

.
.
.
On site
.
.
.

Signed Sun, Aug 2 · 6:22 PM by Nora Harper.

How this job gets done

Walls, trim, ceilings. Two coats, furniture shifted, daily clean.

  1. 01Shoot the before. Each wall and the trim. Move furniture to the center and cover it.
  2. 02Prep. Fill, sand, caulk. Cut the bad drywall now — don’t paint over a crater.
  3. 03Cut in, then roll. Ceiling line and trim first. Roll into the cut while it’s still wet.
  4. 04Second coat. Same sequence. Don’t skip the dry time the can names.
  5. 05After photos. Pull the tape, put the room back, same angles as the before set.

Rooms we measured

310.7 sf floor · 4.75 gal paint

Kitchen16.4' × 14.2' · 232.9 sf
Dining nook8.1' × 9.6' · 77.8 sf

Before and after photos

North wall before demo
before · North wall before demo
Quartz dry fit
progress · Quartz dry fit
Backsplash layout
progress · Backsplash layout
Kitchen after hardware — ready for the site
after · Kitchen after hardware — ready for the site

Conversation

Alex · Fri, Aug 21 · 9:40 PM

Tops are set. Backsplash starts tomorrow — kitchen stays usable after 5.

Nora · Fri, Aug 21 · 10:05 PM

Looks better already. Can we talk about the upstairs hall floor while you're here?

Alex · Sat, Aug 22 · 1:50 PM

Yes — I'll measure this afternoon and send a T&M note tonight.

Nora · Sat, Aug 22 · 9:05 PM

I keep walking in just to look at it. Post it if you want — I’m proud of this kitchen.

Money

SR-1044

Due Fri, Aug 28 · 10:00 PM

Pay $5,354.50

Work complete

Sign when the house looks the way we agreed.